[{"data":1,"prerenderedAt":207},["ShallowReactive",2],{"headerMainMenu":3,"siteConstant":15,"headerAdditionalMenu":59,"footerMenu":69,"legalComplianceMenu":77,"local-about-us-about-us":104},{"id":4,"extension":5,"items":6,"meta":12,"stem":13,"__hash__":14},"headerMainMenu\u002Fheader-main-menu\u002Fmenu.json","json",[7],{"label":8,"url":9,"featured_image":10},"About MyPOWER","\u002Fabout-mypower\u002Fabout-us",{"url":11,"alternativeText":8},"\u002Fimages\u002Fmenu\u002Fabout-mypower.png",{},"header-main-menu\u002Fmenu","wtRjwyiFnfvFQ91_gXfGzpasg8LCs3mHwvZNY2t6vbc",{"id":16,"address":17,"addressGoogleMapUrl":18,"companyName":19,"companyRegistrationNumber":20,"email":21,"extension":5,"fax":22,"latitude":23,"longitude":24,"meta":25,"opening_hours":26,"phone":34,"social_media_links":35,"statsUpdatedAt":54,"stem":55,"tagline":56,"totalVisitors":57,"__hash__":58},"siteConstants\u002Fsite-constants\u002Fconstants.json","\u003Cp>\u003Cspan style=\"font-weight: 600;\">Malaysia Programme Office for Power Electricity Reform Corporation (MyPOWER)\u003C\u002Fspan>\u003Cbr\u002F>Level 8-1, Menara Pernas,\u003Cbr\u002F>Tower 7, Avenue 7, Bangsar South City,\u003Cbr\u002F>No.8, Jalan Kerinchi, 59200 Kuala Lumpur.\u003C\u002Fp>","https:\u002F\u002Fwww.google.com\u002Fmaps\u002Fembed?pb=!1m14!1m8!1m3!1d3983.932118268302!2d101.6678345!3d3.1126627!3m2!1i1024!2i768!4f13.1!3m3!1m2!1s0x31cc49004dbe5329%3A0x30f55a2775a04baa!2sMyPOWER%20Corporation!5e0!3m2!1sen!2smy!4v1787016495565!5m2!1sen!2smy","Malaysia Programme Office for Power Electricity Reform Corporation (MyPOWER)","201101007375 (935513-U)","corporate@mypower.gov.my","","3.017778","101.613917",{},[27,31],{"dayOfWeek":28,"opens":29,"closes":30},"Monday – Friday","8:30 AM","5:30 PM",{"dayOfWeek":32,"opens":33,"closes":33},"(Closed on Weekends & Public Holidays)",null,"+603-9078 2474",[36,42,48],{"label":37,"url":38,"icon":39,"iconClass":41},"Facebook","https:\u002F\u002Fwww.facebook.com\u002F",{"url":40},"\u002Fimages\u002Ficons\u002Fsocials\u002FFacebook.svg","pi pi-facebook",{"label":43,"url":44,"icon":45,"iconClass":47},"Instagram","https:\u002F\u002Fwww.instagram.com\u002F",{"url":46},"\u002Fimages\u002Ficons\u002Fsocials\u002FInstagram.svg","pi pi-instagram",{"label":49,"url":50,"icon":51,"iconClass":53},"LinkedIn","https:\u002F\u002Fwww.linkedin.com\u002F",{"url":52},"\u002Fimages\u002Ficons\u002Fsocials\u002FLinkedin.svg","pi pi-linkedin","2026-09-01T18:01:19.221Z","site-constants\u002Fconstants","\u003Cp>This is the official website of the Malaysia Programme Office for Power Electricity Reform Corporation (MyPOWER).\u003C\u002Fp>\u003Cp>MyPOWER operates under the Ministry of Energy Transition and Water Transformation (PETRA).\u003C\u002Fp>",153,"tD37whAobn3Nw58gMt1K4eolD19zn4YjQ5dOFCvGuCs",{"id":60,"extension":5,"items":61,"meta":66,"stem":67,"__hash__":68},"headerAdditionalMenu\u002Fheader-additional-menu\u002Fmenu.json",[62],{"label":63,"url":64,"style":65},"Contact MyPOWER","\u002Fcontact-us","primary",{},"header-additional-menu\u002Fmenu","txVBeH-ufaVMtzeMbbN3Q1666pO6WfrpQCsZNUTJgao",{"id":70,"extension":5,"items":71,"meta":74,"stem":75,"__hash__":76},"footerMenu\u002Ffooter-menu\u002Fmenu.json",[72,73],{"label":8,"url":9},{"label":63,"url":64},{},"footer-menu\u002Fmenu","_ndyj0arVBIgMXPPi23GfBAIPMdbTQAT3kpf5cH0gA0",{"id":78,"extension":5,"items":79,"meta":101,"stem":102,"__hash__":103},"legalComplianceMenu\u002Flegal-compliance-menu\u002Fmenu.json",[80,83,86,89,92,95,98],{"label":81,"url":82},"Privacy Notice","\u002Fprivacy-notice",{"label":84,"url":85},"Terms of Use","\u002Fterms-of-use",{"label":87,"url":88},"Cookie Notice","\u002Fcookie-notice",{"label":90,"url":91},"Accessibility Statement","\u002Faccessibility-statement",{"label":93,"url":94},"Disclaimer","\u002Fdisclaimer",{"label":96,"url":97},"Sitemap","\u002Fsitemap",{"label":99,"url":100},"Integrity and Whistleblowing","\u002Fintegrity-and-whistleblowing",{},"legal-compliance-menu\u002Fmenu","szU2i5iJkE2HrepAMmizUoIZwZG-1V8JkKvCXgAal38",{"id":105,"title":106,"body":33,"description":33,"extension":5,"meta":107,"navigation":108,"path":109,"sections":110,"seo":200,"seo_settings":201,"slug":204,"stem":205,"__hash__":206},"aboutUs\u002Fabout-us\u002Fabout-us.json","About Us",{},true,"\u002Fabout-us",[111,119,126,147,163,183],{"__component":112,"title":106,"description":113,"breadcrumbs":114,"bg_image":117},"page-banner","\u003Cp>Serves as the lead agency for electricity supply industry reform and the development of nuclear power generation programmes in support of the national energy transition and sustainability.\u003C\u002Fp>",[115,116],{"label":8,"url":33},{"label":106,"url":9},{"url":118},"\u002Fimages\u002Fbanner\u002Fabout-us-banner.png",{"__component":120,"featured_image":121,"quote":123,"quotee":124,"quoteeDesignation":125},"quote",{"url":122},"\u002Fimages\u002Fstock\u002Fdatuk-haji-amar.png","Malaysia's energy sector is evolving, and so is the scope of our work. We're strengthening the electricity supply industry to be fairer, more resilient and more competitive, while planning responsibly for nuclear as a future generation option to support a low-carbon, dependable energy future.\u003Cbr>\u003Cbr>With a future-ready outlook, we're leading Malaysia's energy transition with resilience and purpose, balancing affordability, reliability and sustainability for the nation's continued growth.","YAB Datuk Amar Haji Fadillah bin Haji Yusof","Minister of PETRA",{"__component":127,"headline":128,"title":129,"description":130,"items":131},"featured-dual-cards","Who We Are","Established to Lead Malaysia's Energy Transition","\u003Cp>Malaysia Programme Office for Power Electricity Reform Corporation (MyPOWER) is a Company Limited by Guarantee (CLBG) operating under the purview of the Ministry of Energy Transition & Water Transformation (PETRA).\u003C\u002Fp>\u003Cp>Established to drive structural reforms within the national power sector, MyPOWER acts as a strategic advisory and programme implementation organisation committed to ensuring energy security, industry sustainability, and economic resilience.\u003C\u002Fp>",[132,138],{"headline":33,"title":133,"description":134,"buttons":135,"bg_image":136},"Vision Statement","To be the trusted agency guiding safe, innovative, and sustainable energy solutions that empower our country’s progress and uphold our global environmental commitments.",[],{"url":137},"\u002Fimages\u002Fstock\u002Fvision.png",{"headline":33,"title":139,"description":140,"buttons":141,"bg_image":145},"Mission Statement","To facilitate the responsible deployment of energy technologies, including nuclear, through safety-driven governance, alignment with national policies, international compliance, and cross-sector collaboration to ensure energy resilience and long-term national development.",[142],{"label":143,"url":144,"style":65},"Explore Programmes","\u002F",{"url":146},"\u002Fimages\u002Fstock\u002Fmission.png",{"__component":148,"headline":149,"title":150,"description":151,"items":152},"dual-rounded-cards","Strategic MANDATE","Our Mandate","\u003Cp>MyPOWER is entrusted with two core national mandates that support Malaysia's long-term energy transition.\u003C\u002Fp>",[153,158],{"headline":33,"title":154,"description":155,"bg_image":156},"Nuclear Energy Programme Implementing Organisation (NEPIO)","Providing leadership to plan, coordinate, and prepare the national infrastructure for nuclear energy power generation as an option post-2035, strictly adhering to international safety guidelines and IAEA frameworks.",{"url":157},"\u002Fimages\u002Fstock\u002Fmandate-NEPIO.png",{"headline":33,"title":159,"description":160,"bg_image":161},"Future-Proofing Malaysia Electricity Supply Industry (FP MESI)","Coordinating and implementing comprehensive industry reforms across governance, system planning, market design, third-party grid access, and tariff structures.",{"url":162},"\u002Fimages\u002Fstock\u002Fmandate-2.png",{"__component":164,"headline":165,"title":166,"description":33,"items":167},"timeline-slider","Mandate Period","Continuity of Our Mandate",[168,171,174,177,180],{"title":169,"description":170},"Mid-2018","\u003Cul>\u003Cli>MyPOWER was re-activated with the approval of Cabinet.\u003C\u002Fli>\u003Cli>No specific end date of its tenure was mentioned in the Cabinet decision.\u003C\u002Fli>\u003C\u002Ful>",{"title":172,"description":173},"End-2018","\u003Cul>\u003Cli>Former MESTECC Minister approved the establishment of MyPOWER for the period of three (3) years from 1 January 2019 to 31 December 2021.\u003C\u002Fli>\u003Cli>In 14 Disember 2020, KeTSA reviewed the option for early de-activation MyPOWER, however, maintained the existing timeline.\u003C\u002Fli>\u003C\u002Ful>",{"title":175,"description":176},"Mid-2021","\u003Cul>\u003Cli>On 11 February 2021, KeTSA approved that MyPOWER undertake MESI study and given this mandate, MyPOWER's tenure was extended to end 2022.\u003C\u002Fli>\u003C\u002Ful>",{"title":178,"description":179},"End-2022","\u003Cul>\u003Cli>On 7 September 2022, the Board had agreed to recommend the extension of tenure for MyPOWER from 1 January 2023 to 31 December 2024, to coordinate the implementation of FP MESI initiatives.\u003C\u002Fli>\u003Cli>The extension for the proposed duration was subsequently approved by YB KeTSA Minister.\u003C\u002Fli>\u003C\u002Ful>",{"title":181,"description":182},"End-2023 (Now)","\u003Cul>\u003Cli>Deliberation on the direction of MyPOWER post 2024.\u003C\u002Fli>\u003C\u002Ful>",{"__component":184,"headline":185,"title":186,"description":33,"items":187},"grid-icon-cards","STRATEGIC EVOLUTION & JOURNEY","Our Evolution",[188,192,196],{"headline":189,"title":190,"description":191},"2010-2014","Phase 1: MESI 1.0","\u003Cp> Incorporated as a special purpose agency to lead initial electricity supply industry reforms (governance, tariffs, PPA renegotiations, and IBR).\u003C\u002Fp>",{"headline":193,"title":194,"description":195},"2018–2024","Phase 2: FP MESI","\u003Cp>Reactivated by Cabinet approval to execute MESI 2.0 and develop the Future-Proofing MESI framework comprising 10 strategic reform initiatives.\u003C\u002Fp>",{"headline":197,"title":198,"description":199},"2025-2030","Phase 3: Industry Reform & NEPIO","\u003Cp>Mandate extended to support market structure evolution and serve as the national NEPIO, leading preparatory work for low-carbon energy options under RMK-13.\u003C\u002Fp>",{"title":106},{"metaTitle":202,"metaDescription":203},"About MyPOWER | National Energy Transition Agency","Learn about MyPOWER's  mandate under PETRA: future-proofing the Malaysia Electricity Supply Industry (FP MESI) and driving NEPIO clean energy planning.","about-us","about-us\u002Fabout-us","WAcEWsD7ksV9n7lVu5B-2qg2aE_rXko5wCpFDfEQKLY",1788285694806]